|
|
|||||
![]() |
|||||
|
The first goal of this project was to add new space and to renovate existing space above the existing study and existing bedroom to provide a new master bedroom suite with a master bathroom, walk-in closets and sitting area. The second goal was to add new space above the garage to create a new bedroom with closet and bathroom and to renovate existing space to provide a new laundry room with closets and an exercise area. |
|
||||
|
|
|||||
|
|
|||||
|
|
|||||